2BA visits the renovation works in Salcombe. We have checked that the works go as planned: the new layout of the flat is ready and the water and electrical installations are set.
2BA visits the renovation works in Salcombe. We have checked that the works go as planned: the new layout of the flat is ready and the water and electrical installations are set.